As you lot know, at that spot are 2 ways a ability furnish tin displace hold upward turned-on together with off. One method is to apply or take the air conditioning input ability via a switch or circuit breaker to the supply. Another method is purpose the Remote On/Off command of the supply, if the unit of measurement has this feature. Let’s examine both methods.
The curves below (Fig. 1) demo the typical delay betwixt when the air conditioning input ability (Vin) is applied together with the ability supply’s output reaches its rated voltage of 12V nether total charge conditions. As tin displace hold upward seen (in this example) amongst a depression air conditioning input of 85VAC the output turn-on delay is slightly to a greater extent than than amongst higher input voltages. However, inwards this example, the typical turn-on delay is nearly 250ms together with the output ascent fourth dimension is nearly 25ms.

Conditions:
| Vin | : 85VAC (A) |
| : 115VAC (B) | |
| : 230VAC (C) | |
| : 264VAC (D) | |
| lout | : 100% |
| Ta | : 25°C |
Fig. 1
The side past times side curves (Fig. 2) demo the same ability supply’s output (with 100% load) when the air conditioning input is removed. The fourth dimension delay from when the air conditioning ability is removed (or lost) is referred to equally the Hold-Up fourth dimension spec. For this supply, the specified minimum hold-up fourth dimension is 16ms. As shown below, the measured hold-up fourth dimension is nearly 30ms, which meets the spec. The output autumn fourth dimension is about 10ms, when measured from 90% to 10%. Note that the set out energy is pulled from the ability furnish rattling apace due to the heavy charge on its output.
Fig. 2
By comparison, without a charge (zero load), the curves below (Fig. 3) demo that the Hold-Up fourth dimension of the ability furnish increases substantially to nearly 1.8 seconds, together with the output drops to null inwards nearly half dozen seconds!
Fig. 3
Below is a graph (Fig. 4) for this ability furnish that shows how minimum Hold-Up fourth dimension varies equally the charge changes betwixt 10% together with 100% (maximum load).
Fig. 4
Next, nosotros shall review how the remote on/off command (if used) tin displace deport upon the ability supply’s output rise/fall, together with delay times.
Conditions:
| Vin | : 115VAC (A) |
| lout | : 100% |
| Ta | : 25°C |
Fig. v
In the higher upward curves (Fig. 5), the remote On/Off command is the bottom line together with higher upward that is the ability supply’s DC OK dot level. This province of affairs assumes the air conditioning input inwards ever on. As tin displace hold upward seen, from the fourth dimension the Remote On is activated (goes from high to depression logic level); it takes the output nearly 150ms to accomplish its total rated voltage. And, the DC OK dot changes nation when the output marking is nearly 75% of its rated voltage, which inwards this representative is nearly 125ms afterwards the Remote On dot is activated.
The side past times side laid upward of curves (Fig. 6) demo the contrary situation, where the Remote On/Off dot is used to plough the ability furnish off.
Fig. 6
There is nearly 25ms delay afterwards the Remote On/Off changes nation to when the Vout reduces to about 75% its nominal. In addition, at that fourth dimension the DC OK dot changes state. The output autumn time, from 90% to 10% of nominal, is about 15ms.
From the higher upward curves together with explanations, I believe the reader tin displace reckon why our answer at the kickoff was "it depends." In these types of measurements, delay times are inwards many cases to a greater extent than of import than ascent together with autumn times. Other considerations include the air conditioning input voltage, the load, operating temperatures, measuring criteria together with the pattern specifications for the ability supply.